National Repository of Dissertations in Serbia
    • English
    • Српски
    • Српски (Serbia)
  • English 
    • English
    • Serbian (Cyrilic)
    • Serbian (Latin)
  • Login
View Item 
  •   NaRDuS home
  • Универзитет у Новом Саду
  • Факултет техничких наука
  • View Item
  •   NaRDuS home
  • Универзитет у Новом Саду
  • Факултет техничких наука
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

Unapređenje efikasnosti proizvodnih procesa razvojem proširenog modela toka vrednosti

Improving manufacturing efficiency by developing expanded value stream model

Thumbnail
2014
Disertacija.pdf (7.555Mb)
IzvestajKomisije.pdf (264.0Kb)
Author
Gračanin, Danijela
Mentor
Buhmajster, Boruh
Committee members
Ćosić, Ilija
Tešić, Zdravko
Maksimović, Rado
Nikolić, Vlastimir
Lalić, Bojan
Buhmajster, Boruh
Metadata
Show full item record
Abstract
U okviru disertacije se ispituje uticaj akumulacije troškova u vremenu na izbor odgovarajućih mera za unapređenje i povećanje efikasnosti proizvodnih procesa. Ovaj uticaj je stavljen u kontekst lin proizvodnje i procesa mapiranja toka vrednosti, ali je ispitivan i uticaj izbora pravila raspoređivanja radnih naloga, odnosno terminskog planiranja na vremensko-troškovno ulaganje. Kao rezultat istraživanja i originalan naučni doprinos ove disertacije predloženi su koeficijenti ulaganja i efikasnosti mera unapređenja koji se koriste, na prvom mestu za izbor odgovarajuće mere unapređenja, a zatim i za definisanje prioriteta sprovođenja mera.
This dissertation examines the impact of the cost accumulation over the time on the selection of appropriate measures to improve and increase the efficiency of production processes. This effect has been put into the context of lean production and value stream mapping, but there is also examines the impact of job shop schenduling on cost-time investment. As a result of research and original scientific contribution of this thesis two coefficients are proposed: coefficient of investment and coefficient of measure efficiency that can be used in the first place for the selection of appropriate measure for the improvement, and then to define the priorities for implementing the improvement measures.
Faculty:
Универзитет у Новом Саду, Факултет техничких наука
Date:
24-10-2014
Projects:
  • Development of software for the repair management and assembly of rail car brake system (RS-35050)
  • Advancing Serbia's Competitiveness in the Process of EU Accession (RS-47028)
Keywords:
Lin proizvodnja / Lean production / value stream mapping / value stream costing / cost-time profile / cost-time investment / discrete event simulation / mapiranje toka vrednosti / računovodstvo zasnovano na toku vrednosti / vremensko-troškovni profil / vremensko-troškovno ulaganje / simulacija diskretnih događaja
[ Google Scholar ]
Handle
https://hdl.handle.net/21.15107/rcub_nardus_1910
URI
https://nardus.mpn.gov.rs/handle/123456789/1910
http://www.cris.uns.ac.rs/DownloadFileServlet/Disertacija140904357568780.pdf?controlNumber=(BISIS)89974&fileName=140904357568780.pdf&id=2546&source=NaRDuS&language=sr
http://www.cris.uns.ac.rs/record.jsf?recordId=89974&source=NaRDuS&language=sr
http://www.cris.uns.ac.rs/DownloadFileServlet/IzvestajKomisije140904358784636.pdf?controlNumber=(BISIS)89974&fileName=140904358784636.pdf&id=2547&source=NaRDuS&language=sr

DSpace software copyright © 2002-2015  DuraSpace
About NaRDus | Contact us

OpenAIRERCUBRODOSTEMPUS
 

 

Browse

All of DSpaceUniversities & FacultiesAuthorsMentorCommittee membersSubjectsThis CollectionAuthorsMentorCommittee membersSubjects

DSpace software copyright © 2002-2015  DuraSpace
About NaRDus | Contact us

OpenAIRERCUBRODOSTEMPUS